Thread: The Big Red Mechmate in Aus
Threaded View
-
27-06-2014 #3
The terminal marked (-) with the ground symbol is connected to ground. Are you sure the relay you have is the correct supply voltage?
With the supply voltage on you should be able to measure voltage between T11 or T33 and (-) ground symbol connector. As you say linking T11 to T12 and T22 should supply power to the relay coils. Linking X1 and X2 provides the link for the reset. So you should be able to press the reset button, link between T33 and T34, with the power on and the relay should work.
More info here : http://www.google.co.uk/url?url=http...nN3ImeJyLyD7tw
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: Building a mechmate here in the u.k
By kingfisher in forum DIY Router Build LogsReplies: 1Last Post: 30-01-2010, 02:13 AM
Bookmarks