. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #20
    I thought the pen would have run out before finishing that aztec drawing, looks great though.

    My setup is like this;

    I have two breakout boards, one connects to the ESS Port#1, the other to Port#2

    Breakout boards connect to ESS using these; http://www.ebay.co.uk/itm/25cm-25-Wi...item5af9b1c491

    The Z probe is connected to breakout board 2 (the one connected to ESS port 2), pin 15
    Because the Z probe is switching to earth the bob Gnd pin must also be connected to earth otherwise there would be no circuit, I did this by connecting the bob power supply negative terminal to earth.
    On the ESS config page Port#2 'pins 2 through 9 direction' is set to 'In'
    The ESS driver I'm using is ESS_v10r2d1d (the latest)

    These are my Mach 3 settings;

    Port#1 = 0x378 enabled = yes (ticked)
    Port#2 = 0x278 enabled = yes (ticked)
    Ports & Pins page; 'Probe' input = port 2, pin 15, enabled(ticked), active low(ticked).
    Last edited by EddyCurrent; 24-09-2014 at 09:49 AM.
    Spelling mistakes are not intentional, I only seem to see them some time after I've posted

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: Building a mechmate here in the u.k
    By kingfisher in forum DIY Router Build Logs
    Replies: 1
    Last Post: 30-01-2010, 02:13 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •