Ladies and gents,

Today I can happily announce the arrival of my leadscrew. :-)
Which means that very shortly the machine build can re-start. The only components I don't have yet are the power supply (50V and 12A max, probably play it safe with 45V and 8A should be fine), and the router itself....

EMC2 is running and recognising estops and limit switches, so all in all I can't wait to get stuck back in.

But first I've got to go to Poland...
Back soon I hope...