. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #2
    The carriages should both be installed with the ground surface on the same side. Figure 2 on page 17 of their manual implies that the ground face on the carriage should be on the side of the rail that the arrow points to.
    Old router build log here. New router build log here. Lathe build log here.
    Electric motorbike project here.

  2. The Following User Says Thank You to Jonathan For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. WANTED: BK12 Bearing Block Wanted - 1 off
    By EddyCurrent in forum Items Wanted
    Replies: 7
    Last Post: 11-03-2017, 08:52 PM
  2. FOR SALE: HIWIN & THK guide blocks and rails
    By vigen20 in forum Items For Sale
    Replies: 8
    Last Post: 27-02-2013, 10:37 AM
  3. RFQ: Drill/Tap Guide Block for 15mm aluminium plate edges.
    By Wal in forum Projects, Jobs & Requests
    Replies: 11
    Last Post: 29-11-2012, 04:23 AM
  4. FOR SALE: New Hiwin HGH15 bearing blocks / carriages profile rail
    By Jonathan in forum Items For Sale
    Replies: 0
    Last Post: 06-11-2011, 05:26 PM
  5. Understanding the bearing block
    By Rogue in forum Rails, Guideways & Bearings
    Replies: 10
    Last Post: 28-08-2011, 03:14 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •