. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #23
    Hi Charlie
    When you get the carriage cleaned and running smooth, bolt the rails to your Z plate with the carriages installed but not bolted to matting face, offer the carriage/rail assembly up to your other plate and check the matting face with feelers to see if both plates are flat, one or both of the plates might be twisted or something.
    Regards
    Mike
    Last edited by mekanik; 20-04-2016 at 08:58 PM.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Design of small router (700x900) for aluminium
    By Edward in forum Gantry/Router Machines & Building
    Replies: 7
    Last Post: 16-12-2017, 07:34 PM
  2. BUILD LOG: New Build, Aluminium Frame Router/Mill
    By Davek0974 in forum DIY Router Build Logs
    Replies: 101
    Last Post: 31-08-2016, 05:28 PM
  3. BUILD LOG: Steel Frame, Aluminium Hybrid Design Thread
    By f1sy in forum DIY Router Build Logs
    Replies: 0
    Last Post: 23-02-2016, 10:04 AM
  4. CNC Frame Design Help
    By zhenning in forum Gantry/Router Machines & Building
    Replies: 9
    Last Post: 26-12-2015, 05:44 PM
  5. BUILD LOG: Steel frame cnc router design/build
    By CraftyGeek in forum DIY Router Build Logs
    Replies: 110
    Last Post: 06-05-2015, 10:00 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •