Thread: My Build
Threaded View
-
15-05-2009 #7
Ok that seems to have worked.
So
The next photos show my machine through various stages of my build.
The first is a side view of my built up Z axis,the next is my X axis and Z parts built. The next part I built up was the table that it all was going to sit on.
After mounting to the table I started to wire in my limits and homing switches these all terminated into a junction box on the rear of my gantry I used shielded cable where possible then used a multicore shielded cable to connect them to my main control box.
The main control box was fastened to the side of the table then the Y axis was built up and assembled.
Thread Information
Users Browsing this Thread
There are currently 2 users browsing this thread. (0 members and 2 guests)
Similar Threads
-
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM



Reply With Quote
Bookmarks