. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Finished the last work on the gantry before it goes on the machine.

    Did the last bit of welding for the bottom plates and epoxy dams


    When I did this it was raining everyday here in sunny South Africa so I had no choice but to spray inside. This reminded me why I hate to spray indoors. Managed to get it sprayed but also the floor, myself, my tool cupboards and everything else in the near vicinity :-)

    starting to make things ready for the epoxy. Did not take photos of the epoxy process but you you know the drill.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	2014-12-27 20.08.41 (Small).jpg 
Views:	841 
Size:	107.0 KB 
ID:	14374   Click image for larger version. 

Name:	2014-12-29 14.33.52 (Small).jpg 
Views:	823 
Size:	96.1 KB 
ID:	14375   Click image for larger version. 

Name:	2014-12-29 14.34.48 (Small).jpg 
Views:	839 
Size:	116.5 KB 
ID:	14376   Click image for larger version. 

Name:	2014-12-30 22.08.20 (Small).jpg 
Views:	818 
Size:	125.8 KB 
ID:	14377  

  2. #2
    Some work I've done on the Z parts during the last few weeks while I was waiting for epoxy to cure and paint to dry etc.


    Here's some of the laser cut steel parts. Z will be steel and front plate from alu. I wanted my Y and Z carriages on top of each other in sort of a + configuration. I did not want any welding on the actual plates so all the parts just bolts to the plates. This might not make sense but I'll post more pics to hopefully explain it a bit better.

    Welding the z ball skrew mount


    After some serious welding, grinding and sanding

    Managed to get it a little out of square to I'll have to epoxy shim my fixed bearing side a little


    welding part of the z stepper mount



    NB. Newbies please take note!! These leather gloves were new when I started this project, which should give you an indication of the amount of work that goes into building a CNC. ;-)

    but I found this helps a lot, before, after and during the process
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	2014-12-11 19.23.30 (Small).jpg 
Views:	850 
Size:	77.1 KB 
ID:	14378   Click image for larger version. 

Name:	2014-12-11 19.25.01 (Small).jpg 
Views:	872 
Size:	68.9 KB 
ID:	14379   Click image for larger version. 

Name:	2014-12-16 17.44.22 (Small).jpg 
Views:	837 
Size:	135.1 KB 
ID:	14380   Click image for larger version. 

Name:	2014-12-16 18.02.14 (Small).jpg 
Views:	878 
Size:	136.2 KB 
ID:	14381   Click image for larger version. 

Name:	2014-12-16 21.27.35 (Small).jpg 
Views:	152 
Size:	144.5 KB 
ID:	14382   Click image for larger version. 

Name:	2014-12-16 21.30.47 (Small).jpg 
Views:	853 
Size:	132.7 KB 
ID:	14383   Click image for larger version. 

Name:	2014-12-16 21.50.17 (Small).jpg 
Views:	842 
Size:	141.1 KB 
ID:	14384   Click image for larger version. 

Name:	2014-12-31 10.27.15 (Small).jpg 
Views:	833 
Size:	88.9 KB 
ID:	14385   Click image for larger version. 

Name:	2014-12-31 11.58.27 (Small).jpg 
Views:	816 
Size:	107.9 KB 
ID:	14386   Click image for larger version. 

Name:	2014-12-31 16.21.35 (Small).jpg 
Views:	171 
Size:	86.1 KB 
ID:	14387  

    Click image for larger version. 

Name:	gloves.jpg 
Views:	853 
Size:	166.4 KB 
ID:	14388  

  3. #3
    Can't wait to see it all put together, it's a work of art.
    Spelling mistakes are not intentional, I only seem to see them some time after I've posted

  4. #4
    Most of the parts are now made and I've started assembling things. Still lots of drilling and tapping to do though.

    Other newbies take note: When you ever post a picture like this and don't realize you have "slightly" over-designed your little 600x500mm DYI router, then sir, you are an idiot Ok, its not really that heavy but its more than uncomfortable for one person to lift.


    setting up x rails




    Made these little adjusters front and back of both gantry bases (stainless allencap in pic below) to help adjusting things before I epoxy putty mated the gantry to the alu base plates. I'll use them again for final epoxy shimming if required once the z is on.


    Aligning and measuring stuff. Really pleased with how things are turning out and I'm cautiously optimistic I'll get the accuracy I was hoping for.



    No mater how well you think things thru beforehand there's always going to be that one hole you have to drill in an impossible place. No turning back now so just have to make a plan...


    X and Y rails and X ball skrews fitted. Have to compete the Z back plate before I can fit Y ball skrew


    Test fitting parts of the z back plate. Still quite a bit work left on the z but I hope to complete that next weekend.


    So close but so far....
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	2015-01-01 18.25.44 (Small) (2).jpg 
Views:	854 
Size:	123.0 KB 
ID:	14389   Click image for larger version. 

Name:	2015-01-01 18.25.44 (Small).jpg 
Views:	838 
Size:	112.1 KB 
ID:	14390   Click image for larger version. 

Name:	2015-01-01 18.26.32 (Small).jpg 
Views:	829 
Size:	111.8 KB 
ID:	14391   Click image for larger version. 

Name:	2015-01-01 19.33.20 (Small).jpg 
Views:	815 
Size:	77.6 KB 
ID:	14392   Click image for larger version. 

Name:	2015-01-02 22.13.04 (Small).jpg 
Views:	844 
Size:	103.9 KB 
ID:	14393   Click image for larger version. 

Name:	2015-01-08 22.06.55 (Small).jpg 
Views:	166 
Size:	83.4 KB 
ID:	14394   Click image for larger version. 

Name:	2015-01-10 10.37.29 (Small).jpg 
Views:	849 
Size:	94.2 KB 
ID:	14395   Click image for larger version. 

Name:	2015-01-10 12.48.35 (Small).jpg 
Views:	825 
Size:	87.1 KB 
ID:	14396   Click image for larger version. 

Name:	2015-01-10 13.14.06 (Small).jpg 
Views:	834 
Size:	102.3 KB 
ID:	14397   Click image for larger version. 

Name:	2015-01-11 19.52.35 (Small).jpg 
Views:	831 
Size:	70.8 KB 
ID:	14398  


  5. #5
    WOW. A little OTT perhaps, but awesome - absolutely mighty. I think that this might just qualify for the best homebrew ever. Geoff.

  6. #6
    Gents, thanks for the kind words. I really hope the end product is going to be be worth the effort that going in :-)

  7. #7
    Fitted and aligned the Y ball skrew and complete Z axis, so most of the mechanical parts are done now.

    z front plate before all the drilling and tapping


    Had to but join rails for my Z due to a change in plans. Was quite surprised as the carriages runs very smoothly over the joint with absolutely no click or resistance, so it seams feasible to join rails if one has to.


    z stepper mount



    100mm spindle fitted just to see if all the holes line up etc.


    Now time to start with the control box which is about where I run out of skill and creativety. Wish Eddy could pop over to my place to help a bit:-) I sort of know what needs to be connected but I cant figure out a good layout to do a neat job with routing all that wires etc.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	20150117_093836.jpg 
Views:	1023 
Size:	86.2 KB 
ID:	14523   Click image for larger version. 

Name:	20150124_093837.jpg 
Views:	1033 
Size:	92.2 KB 
ID:	14524   Click image for larger version. 

Name:	20150124_182855.jpg 
Views:	1161 
Size:	85.3 KB 
ID:	14525   Click image for larger version. 

Name:	20150124_182909.jpg 
Views:	1057 
Size:	93.9 KB 
ID:	14526   Click image for larger version. 

Name:	20150124_214956.jpg 
Views:	1104 
Size:	90.7 KB 
ID:	14527  

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. advise options needed on laser upgrade/add on
    By george uk in forum Laser Machines & Building
    Replies: 9
    Last Post: 19-07-2014, 10:54 PM
  2. Newbie design need advise
    By mogu in forum Gantry/Router Machines & Building
    Replies: 3
    Last Post: 15-07-2014, 04:52 PM
  3. Welding Advise Needed - Can this welder cope?
    By cncJim in forum Welding, Brazing & Equipment
    Replies: 4
    Last Post: 20-02-2014, 01:25 PM
  4. Chinese 6040 CNC Router Advise Needed
    By Bob Hepple in forum Chinese Machines
    Replies: 24
    Last Post: 27-11-2013, 12:00 PM
  5. Flappy machine - Advise needed please!
    By cncJim in forum Machine Discussion
    Replies: 22
    Last Post: 01-11-2013, 03:23 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •