. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #19
    Eddy, I saw the little square pours and the 'joints' between the uprights and the rail beams and thought that was where you had laid the epoxy, then I read backwards ...

    Okay so epoxy will correct minor differences in the rails and the beams, where else can I build in adjustability I don't include basic adjustment in the feet (they were there to take up floor unevenness)

    I can get the rail carrying beams milled top and bottom to give me a sporting chance and have a the lip milled in for the datum edge of the rails.
    Last edited by Wobblybootie; 16-10-2014 at 10:33 PM.
    Tim G-C

    “I disapprove of what you say, but I will defend to the death your right to say it.”

    (attrib. Voltaire but written by Evelyn Beatrice Hall "The Friends of Voltaire" 1906)

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: a Steel Box Section Build with SBR20 & Ballscrews Plus a few questions
    By grain_r in forum DIY Router Build Logs
    Replies: 130
    Last Post: 27-01-2023, 06:47 PM
  2. BUILD LOG: New Build - For Your Amusement - MK-2 build
    By Karl in forum DIY Router Build Logs
    Replies: 12
    Last Post: 08-02-2017, 08:03 PM
  3. Replies: 1
    Last Post: 01-03-2014, 01:31 AM
  4. BUILD LOG: Steel Router 610 x 1220 x 200
    By Stickio in forum DIY Router Build Logs
    Replies: 12
    Last Post: 18-08-2011, 07:27 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •