Quote Originally Posted by Gotty101 View Post
Thank you everyone especially to JazzCNC for all your help. Today i finally got my cnc to move by mach and the motion controller for the first time. Im very pleased. Ive got some jobs to do yet like finish the control panel on the cnc itself, and sort the mist system.


I have one drive disconnected at the mo and have bypassed the alarm (will do a much better job of that), as that is for the eventual 4th axis, but i will learn the 3 first.



Thanks again guys

Trev
Well done Trev, looking good. It's a good feeling when it moves for the first time isn't it! Finish off what needs doing first before starting to use it....otherwise it'll still need doing in 6 months time, ask me how I know!

Need to post a video of it cutting next...