Thread: Use of epoxy for levelling
Threaded View
-
24-08-2015 #21
so in theory i should get the frame as level as a human can by hand using adjustment castors on the feet, then once thats as level as you can get it i then place the dam ontop of the frame (im using 25mm rails so my dam will be 65mm wide) then pour epoxy into the dam and let it level out then wait for about 2 weeks (to be safe) and then i can now bolt my rails ontop of the epoxy assuming its flat level?
cheers
ash
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Self levelling epoxy resin
By flanagaj in forum Gantry/Router Machines & BuildingReplies: 5Last Post: 21-11-2020, 01:47 AM -
Epoxy granite or mineral casting
By mike mcdermid in forum Gantry/Router Machines & BuildingReplies: 46Last Post: 20-02-2014, 06:21 PM -
Epoxy Granite Molds?
By gavztheouch in forum Moulding MachinesReplies: 8Last Post: 18-02-2014, 07:28 PM -
Epoxy pouring advice
By cncJim in forum General DiscussionReplies: 12Last Post: 18-02-2014, 05:25 PM -
Epoxy cast plastic injection tools
By gavztheouch in forum Moulding MachinesReplies: 0Last Post: 27-01-2014, 11:33 PM



Reply With Quote
Bookmarks