Threaded View
-
10-04-2015 #11
The Nema 23 boss is 1.5" - so 38.1mm. It's there to allow the motor to be mounted concentrically to another shaft by machining the mount to be a close fit on the 38.1mm diameter. In the case here, there is nothing to align concentric to, so all that is required is a cutout of enough to allow the boss to fit. There's often a +-0.05mm tolerance on the boss diameter, so in the past I've machined the cutouts to 38.2mm to be on the safe side. You don't want it tight else it will be harder to tension the belt. Also the cutout for the boss needn't go all the way through the material - 2mm deep would be plenty. e.g:
Thread Information
Users Browsing this Thread
There are currently 3 users browsing this thread. (0 members and 3 guests)
Similar Threads
-
BUILD LOG: a Steel Box Section Build with SBR20 & Ballscrews Plus a few questions
By grain_r in forum DIY Router Build LogsReplies: 130Last Post: 27-01-2023, 06:47 PM -
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM -
Newbie CNC Build
By JunkieHobbo in forum Gantry/Router Machines & BuildingReplies: 35Last Post: 13-04-2012, 07:41 PM -
BUILD LOG: Newbie First Build 3000mm x 1500mm
By psiron in forum DIY Router Build LogsReplies: 16Last Post: 16-07-2010, 11:02 AM -
BUILD LOG: Newbie First Build
By Dr Snuggles in forum DIY Router Build LogsReplies: 0Last Post: 10-01-2010, 07:05 PM



Reply With Quote
Bookmarks