Hybrid View
-
08-07-2015 #1
This one has it right. Proven a couple of times. Also drawing circles with pulley external dimension / teeth/ as per specs, connecting circles with straight lines at tangential points, deleting unnecessary and using CAD to calculate total length has proven spot on, even for a couple of pulleys where small to none adjustment was necessary.
-
The Following 2 Users Say Thank You to Boyan Silyavski For This Useful Post:
-
17-07-2015 #2
-
01-08-2015 #3
Quick question gentlemen, on my long axis I have a motor ballscrew setup for each side, what is the best way to align & make parallel both rail blocks/side plates/etc before attaching the gantry pieces and make one of the motors a slave? should I get a long machinist square? I don't have one that would reach all the way to the other side atm but would that suffice anyway?
thanks!
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: a Steel Box Section Build with SBR20 & Ballscrews Plus a few questions
By grain_r in forum DIY Router Build LogsReplies: 130Last Post: 27-01-2023, 06:47 PM -
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM -
Newbie CNC Build
By JunkieHobbo in forum Gantry/Router Machines & BuildingReplies: 35Last Post: 13-04-2012, 07:41 PM -
BUILD LOG: Newbie First Build 3000mm x 1500mm
By psiron in forum DIY Router Build LogsReplies: 16Last Post: 16-07-2010, 11:02 AM -
BUILD LOG: Newbie First Build
By Dr Snuggles in forum DIY Router Build LogsReplies: 0Last Post: 10-01-2010, 07:05 PM
Bookmarks