Threaded View
-
01-08-2015 #20
I bought a straight edge and set one rail straight. Then put the carriage block on the beatings and set it square with a dti mounted on the straight rail. Then set the carriage plate square on the other rails carriages. Then put my gantry bottom plate on setting it square with both carriage plates by putting the end plates on as they fastened to both the carriage plate and gantry bottom plate ends, checked with engineers squares. Then drilled and loosely fastened the other rail at one end and sliding the gantry down the rail I marked, drilled and tapped as I went down so using the gantry to align the rails....
Last edited by njhussey; 01-08-2015 at 09:51 PM.
-
The Following User Says Thank You to njhussey For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: a Steel Box Section Build with SBR20 & Ballscrews Plus a few questions
By grain_r in forum DIY Router Build LogsReplies: 130Last Post: 27-01-2023, 06:47 PM -
BUILD LOG: New Build - For Your Amusement - MK-2 build
By Karl in forum DIY Router Build LogsReplies: 12Last Post: 08-02-2017, 08:03 PM -
Newbie CNC Build
By JunkieHobbo in forum Gantry/Router Machines & BuildingReplies: 35Last Post: 13-04-2012, 07:41 PM -
BUILD LOG: Newbie First Build 3000mm x 1500mm
By psiron in forum DIY Router Build LogsReplies: 16Last Post: 16-07-2010, 11:02 AM -
BUILD LOG: Newbie First Build
By Dr Snuggles in forum DIY Router Build LogsReplies: 0Last Post: 10-01-2010, 07:05 PM
Bookmarks