31-07-2015 #81
Ahhh...ok I get it now
....said I was being thick!! I know v little about plasma cutters....and it shows!!
-
01-08-2015 #82
Little bit slower now, onto the small fiddly bits....
Got the Axis hard-stops and beam end-covers designed, cut and fitted..
Fitted the floating head, torch mount and probe/limit switches...
The front Y & A axis limit/home switches...
And the Y far-end limit switch...
Started work on fitting the cable chain to the X axis now.
-
01-08-2015 #83
Looking good, it's the little bits that seem to take the most time....
-
02-08-2015 #84
Looking sweet Dave, nice bit of metal work there!
.Me
-
02-08-2015 #85
Thanks,
another slow day today, had a few orders to make then fitted the cable tracks and trunking and started planning out the bed support frame.
-
06-08-2015 #86
had a couple of hours today, fitted the last of the limit switches and started on the slat support frame.
I thought a seperate frame would be best to avoid putting any heat into the side frames and make replacement easy.
50 40 x 5mm angle fitted into bed opening and a strip fitted to its bottom edge to support the slats vertically.
Quite disappointingly when i did the heavy tacks to secure the bottom return strips, the angle warped and is now 4mm high in the middle
Not good, not sure what to do about it - ignore it and let the THC tackle it, maybe slit the angles vertically in two or three places, press it flat and weld up or something else.
I didn't think angle that heavy would warp!
Apart from that it s all going to plan
-
08-08-2015 #87
Slat bed fitted at last, total PITA
Not 100% happy with it as the 50x3mm strip i ordered is a range of anything between 48x3 and 52x3 !
Will be changing it some time soon i think.
I also fixed the warped slat rails very nicely -
A quick slice with a 2mm disc and weld-up, now it sits perfectly flat on the side beams
The vertical weld was also my first vertical-up weld as i'm normally a bench top welder, didn't come out too bad i thought
Stripped it all for paint now, hopefully the weather will be good tomorrow.
-
09-08-2015 #88
-
10-08-2015 #89
-
11-08-2015 #90
Looking good Dave, coming together nicely!
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
New Build-12x6ft Plasma Table
By F1transportationserv in forum Plasma Table MachinesReplies: 23Last Post: 04-07-2015, 12:14 AM -
Plasma table build, first question....
By Davek0974 in forum Plasma Table MachinesReplies: 51Last Post: 01-08-2014, 03:11 PM -
4' x 4' plasma table build in Canada
By 190-v8 in forum Plasma Table MachinesReplies: 0Last Post: 29-01-2014, 12:27 AM -
BUILD LOG: Let The Fun Begain, New build on the Table.
By Bush Flyer in forum DIY Router Build LogsReplies: 63Last Post: 20-11-2013, 09:19 PM -
3M x 2M Plasma table build
By MonoNeuron in forum DIY Plasma Build LogsReplies: 14Last Post: 01-09-2009, 11:11 AM
Bookmarks