. .

Thread: My Cnc build

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Quote Originally Posted by Skiprat View Post
    ......The holes were plugged with 6mm threaded inserts which will be used to hold down the material to be cut.
    Machine is looking good! Don't try to tighten whatever you're clamping down too tight, the inserts pull out of the MDF really easily or distort the bed round them so it's no longer flat!!
    Last edited by njhussey; 30-11-2016 at 03:14 PM.
    Neil...

    Build log...here

  2. #2
    Here is a picture of the real first job...

    njhussey.....same thoughts as you but upto now the bolt holes held the piece no problems but that might be because its a new piece of mdf.
    Not sure after a lot of spilt coffee etc....

    Light not too good but its visible.

    Click image for larger version. 

Name:	clock dec2016.jpg 
Views:	665 
Size:	47.2 KB 
ID:	19784

    Cheers Tommy

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: a Steel Box Section Build with SBR20 & Ballscrews Plus a few questions
    By grain_r in forum DIY Router Build Logs
    Replies: 130
    Last Post: 27-01-2023, 06:47 PM
  2. BUILD LOG: New Build - For Your Amusement - MK-2 build
    By Karl in forum DIY Router Build Logs
    Replies: 12
    Last Post: 08-02-2017, 08:03 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •