If you have not built it and tested it out I would not fill it yet. Also 3mm is tight for threading what rails are you using? Some people have glued another strip of metal inside the box so as to be able to get a better thread grip. I think Eddycurrent has done this.
..Clive
The more you know, The better you know, How little you know
-
16-12-2015 #2
Hey Clive thanks For the Reply. The only problem I have is that I have to fill it before I weld up the second end with my screw plates at the end. I guess I could make a filling screw at each end but I didn't know how the sand and resin flows as the hole wouldn't be large.
The rails are 20 mm Round supported type that I bought before I started to learn it wasn't the way to go but I have made the design with an eye to swapping to Hiwin in the future.
-
16-12-2015 #3
Sand is as you know extremely abrasive. I filled the base of my Chester Lux mill with the the B&Q variety sand and some gravel mixed in with casting epoxy a while ago too. (I am sure you can find cheaper alternatives to that though like roofing resin?). Then went to drill it to put linear rails and found that my drills would burn as soon as they broke though.
My advice is to drill and tap before filling. Then plug the holes using a hotmelt glue gun.
The epoxy/sand mix does not flow well unless it is more on the epoxy side of weight ratio. I think I did 10% by weight that produced good results but it had the consistency of mortar.https://emvioeng.com
Machine tools and 3D printing supplies. Expanding constantly.
-
16-12-2015 #4
Hello Komatias
Thanks very much for that I didn't even thing of the drilling I just thought It may hold the bolts better. I does certainly sound like I will be best to drill and tap first then and then I think I will come up with a small slider door or something on the box section.
Do I have to use resin or can i just pour the sand in and then empty it in the future If needed ?
Back to the drawing board.
Thanks
Rob.
-
16-12-2015 #5
Make the frame so the sand can added after it's built and removed if needed when moving etc. It's just dampening the vibrations you don't need epoxy unless you intend to leave it in and like has been mentioned this can cause other issues along the way.
-
16-12-2015 #6
Hey Dean
Great thanks very much for that that will be my ideal and I will just tape the holes if I ever need too. Brilliant back to the molten metal then
Thanks
Rob
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Self levelling epoxy resin
By flanagaj in forum Gantry/Router Machines & BuildingReplies: 5Last Post: 21-11-2020, 01:47 AM -
Maximum size of box section, Stacking box section, Construction Angle
By andy586 in forum Gantry/Router Machines & BuildingReplies: 0Last Post: 01-02-2013, 05:29 PM -
Help with name of aluminium section plz
By Fivetide in forum Milling Machines, Builds & ConversionsReplies: 2Last Post: 02-12-2012, 10:01 PM -
Aluminium box section
By martin54 in forum Gantry/Router Machines & BuildingReplies: 11Last Post: 28-10-2012, 01:13 AM -
Re-filling a ball nut
By Robin Hewitt in forum General DiscussionReplies: 2Last Post: 10-08-2011, 11:32 AM
Bookmarks