. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Make the frame so the sand can added after it's built and removed if needed when moving etc. It's just dampening the vibrations you don't need epoxy unless you intend to leave it in and like has been mentioned this can cause other issues along the way.

  2. #2
    Hey Dean

    Great thanks very much for that that will be my ideal and I will just tape the holes if I ever need too. Brilliant back to the molten metal then

    Thanks

    Rob

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Self levelling epoxy resin
    By flanagaj in forum Gantry/Router Machines & Building
    Replies: 5
    Last Post: 21-11-2020, 01:47 AM
  2. Maximum size of box section, Stacking box section, Construction Angle
    By andy586 in forum Gantry/Router Machines & Building
    Replies: 0
    Last Post: 01-02-2013, 05:29 PM
  3. Help with name of aluminium section plz
    By Fivetide in forum Milling Machines, Builds & Conversions
    Replies: 2
    Last Post: 02-12-2012, 10:01 PM
  4. Aluminium box section
    By martin54 in forum Gantry/Router Machines & Building
    Replies: 11
    Last Post: 28-10-2012, 01:13 AM
  5. Re-filling a ball nut
    By Robin Hewitt in forum General Discussion
    Replies: 2
    Last Post: 10-08-2011, 11:32 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •