. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #9
    Other jobs around the house mean slow progress in the build. I've managed to get the second beam machined.

    Click image for larger version. 

Name:	IMG_4698.jpg 
Views:	1949 
Size:	207.1 KB 
ID:	18998

    Click image for larger version. 

Name:	IMG_4700.jpg 
Views:	1928 
Size:	163.8 KB 
ID:	18999

    Drilled and tapped the M5 holes. I bought this spiral fluted tap which has different colour bands for different materials. I thought I'd try this yellow one (for steel) and it works really well.
    Click image for larger version. 

Name:	IMG_4837.jpg 
Views:	2001 
Size:	209.0 KB 
ID:	19000

    I've sprayed them with a light dusting of zinc galvanising spray (screwfix) just to keep the rust off and make them look presentable. I've found this sticks well to metal and resists scratching. (Note Spitfire languishing in the background )
    Click image for larger version. 

Name:	IMG_4845.jpg 
Views:	2018 
Size:	128.7 KB 
ID:	19001

    Click image for larger version. 

Name:	IMG_4847.jpg 
Views:	1950 
Size:	146.6 KB 
ID:	19002

    Next job is to put it all together, shimming if required, then set it aside. Then move onto making parts for the bed.
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  2. The Following 3 Users Say Thank You to routercnc For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 11 users browsing this thread. (0 members and 11 guests)

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •