Threaded View
-
07-01-2016 #8
The X axis bearing connection looks better now. For info you can buy ballnut mounts off e-bay which are longer than the one you have drawn so give a bigger footprint and are stiffer. They are connected by 4 bolts, not 2 which is better.
http://www.ebay.co.uk/itm/Ball-Nut-M...QAAOSwHnFVjdoi
On the Y axis the 2 ways of mounting the ballscrews you have drawn are probably similar in stiffness so go for what seems most practical to make - but how will you mount that box section end-on? You mention turning it around which would be better.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: First Build 5 x 12 Steel Frame CNC router
By Scott Damman in forum DIY Router Build LogsReplies: 104Last Post: 18-01-2017, 06:36 PM -
BUILD LOG: New Build, Aluminium Frame Router/Mill
By Davek0974 in forum DIY Router Build LogsReplies: 101Last Post: 31-08-2016, 05:28 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks