Noticed that I might have some difficulty cutting the motor mount slot accurately on the gantry side, so made it a separate adjustable support plate allowing for the Y axis ball screw to sit more central, more adjustment and lets me get started on welding the gantry before getting access to a mill
Attachment 17667Attachment 17669Attachment 17670Attachment 17671Attachment 17672Attachment 17673
I am going to start welding soon and have next to no experience with this so hope you guys can keep me right:
Attachment 17674Attachment 17675
1. Whats the best way of handeling this, tack up the full frame whilst checking squareness and then weld up fully when happy or do it all in sections?
2. I read on here that short runs are the way to go. Would a 50mm single run along one side of the 50x50 box section be ok or do I do this in two separate runs (25mm)?
3. Are there any parts of the frame I could stitch weld? Maybe the x axis rail support and all of the gantry/side plates? If so, whats the typical size of weld and gap between stitches?
4. Any tips on this/recommended welder settings?Last edited by examorph; 16-10-2017 at 02:52 PM.
Thread Information
Users Browsing this Thread
There are currently 4 users browsing this thread. (0 members and 4 guests)
Similar Threads
-
BUILD LOG: First Build 5 x 12 Steel Frame CNC router
By Scott Damman in forum DIY Router Build LogsReplies: 104Last Post: 18-01-2017, 06:36 PM -
BUILD LOG: New Build, Aluminium Frame Router/Mill
By Davek0974 in forum DIY Router Build LogsReplies: 101Last Post: 31-08-2016, 05:28 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks