Hybrid View
-
04-03-2016 #1
Thanks guys, to confirm, it's just the green bits in the last post its being used for (2x bed supports and some braces).
Only place it needs to be tapped is on the bed supports, so that I can bolt down the ply wood bed onto there. Any options for this with the 3mm box section? Maybe drill through and use a nut/bolt setup?
-
04-03-2016 #2
-
04-03-2016 #3
If the bolts are near the ends of the tubes, get in there first and weld in a reinforcement plate - a lump of 6mm etc welded in from the end would work.
If not then there are very few options really, you could drill a larger hole opposite the bolts so you can pass a socket and nut through to the front but that will only give you strength of the front 3mm section on the bolt, i doubt the hole will make any difference to the beam strength.
Thread Information
Users Browsing this Thread
There are currently 2 users browsing this thread. (0 members and 2 guests)
Similar Threads
-
BUILD LOG: First Build 5 x 12 Steel Frame CNC router
By Scott Damman in forum DIY Router Build LogsReplies: 104Last Post: 18-01-2017, 06:36 PM -
BUILD LOG: New Build, Aluminium Frame Router/Mill
By Davek0974 in forum DIY Router Build LogsReplies: 101Last Post: 31-08-2016, 05:28 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks