Think its now finally time to start looking into the epoxy leveling on the X axis, only thing is getting it up to temperature (I think Dean mentioned 20C for 3 days at least). Other than waiting for the sun to come out (if ever), I think my only other choice is to stick it in the shed with an electric heater. What do you guys think?
When you pour it make a test strip as well say 150mm x 40mm x5mm then after about 4 days check the test strip to see if it will bend or snap. If it snaps ie. very brittle then it is cured.
In the link is a temperature chart.
http://www.westsystem.com/ss/cold-temperature-bonding/..Clive
The more you know, The better you know, How little you know
-
The Following User Says Thank You to Clive S For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 2 users browsing this thread. (0 members and 2 guests)
Similar Threads
-
BUILD LOG: First Build 5 x 12 Steel Frame CNC router
By Scott Damman in forum DIY Router Build LogsReplies: 104Last Post: 18-01-2017, 06:36 PM -
BUILD LOG: New Build, Aluminium Frame Router/Mill
By Davek0974 in forum DIY Router Build LogsReplies: 101Last Post: 31-08-2016, 05:28 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks