I had the main bearing on my router burn out (literally) after about 100 hours running. So my point is that the duty cycle for the Dyson may be short. How long does your PCB 'etching' typically take to run? I realise it depends on the amount of material to be removed. Compare that to the time it takes to vacuum the floors that the Dyson is designed for.