. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Hi Dave,

    Looking great so far. The other option is to slot the holes for the lower bearing idlers - might have to be slotted at a slight angle to avoid hitting the stepper.
    Building a CNC machine to make a better one since 2010 . . .
    MK1 (1st photo), MK2, MK3, MK4

  2. #2
    Yes that would be an option, it would mean having bolt heads on the outside though, not a critical point though.

    Will try a smaller bearing, 24mm dia instead of 26mm, should be enough.

  3. #3
    How are the solution for the X-ballnut coming along? Kinda stuck on the same thing myself.

  4. #4
    I have managed to use the standard ballnut mount blocks for all axes i hope, i just need to finish machining the spacer blocks for the y axis and do the fitting, hopefully be all axes connected this weekend :)

  5. #5
    Stripped it all down today for final finish and fit, ran out of time to start the rebuild but hopefully tomorrow will get some picture update.

    I was going to put the Y axis motor to the rear of the frame but it didn't play nicely and would cost me some Y traverse so I'll leave it at the front. The new idler bearings seem to have sorted the belt issues out, hopefully the motor adjustment slots will be enough to take up the slack without getting a shorter belt.

    My plan is to mount the rails and screws square to the beams, its all pretty rigid and square when assembled so with a bit of luck it will all work out exactly as the drawings indicate.

  6. #6
    Got some motion assembled today, final fitting takes a lot of time...

    Click image for larger version. 

Name:	IMG_1250.jpg 
Views:	408 
Size:	961.0 KB 
ID:	17862

    Click image for larger version. 

Name:	IMG_1249.jpg 
Views:	398 
Size:	920.4 KB 
ID:	17861

    Click image for larger version. 

Name:	IMG_1251.jpg 
Views:	408 
Size:	1.08 MB 
ID:	17863

    Next up is making the bracket for the X axis motor. Then i might remove the grease nipples on the lower X carriages as they are costing me 20mm of travel by hitting the side frames.

    A little more fiddling here and there and we should be ok to start planning wiring runs etc.

  7. #7
    I like how simple it looks, but I know how much careful planning/drawing it took to get there.

  8. The Following User Says Thank You to sinnsvak For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: First time build - Steel Frame CNC Router
    By examorph in forum DIY Router Build Logs
    Replies: 144
    Last Post: 19-10-2023, 06:25 PM
  2. BUILD LOG: Well here goes... Aluminium frame router design
    By CharlieRam in forum DIY Router Build Logs
    Replies: 186
    Last Post: 11-05-2020, 12:39 PM
  3. BUILD LOG: Steel frame cnc router design/build
    By CraftyGeek in forum DIY Router Build Logs
    Replies: 110
    Last Post: 06-05-2015, 10:00 PM
  4. WANTED: CNC Mill/Router for Cutting Aluminium
    By kylelnsn in forum Items Wanted
    Replies: 5
    Last Post: 09-08-2012, 09:54 PM
  5. BUILD LOG: Aluminium Extrusion CNC Router Build
    By joshendy in forum DIY Router Build Logs
    Replies: 9
    Last Post: 10-04-2012, 08:26 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •