Yep, aware that SP is locally available too. In this case I am taking guidance from the person that supplied me with the rails and ballscrews. He works in a facility where they test lubrication and also very experienced across various machine designs. His own personal machines consist of items where they are temperature controlled etc otherwise the machine 'goes out of tolerance'.
In this case the SP was liquid. Ive seen utoob vids where powder is used. As if my 'magic' the dry mix becomes liquid. Amazing stuff this. I used 50ml / kg of cement although I believe 25ml would have been acceptable too. So 1.25litres per 25kg of cement (or one mix for me in my mixer).
-
The Following User Says Thank You to Chaz For This Useful Post:
-
23-08-2016 #2
Have had further progress, will upload pics later. Putty cast, rails mounted with nuts epoxied in. Started to clean up the parts needed to mount the ballscrew. Hope to have this sorted by this weekend and potentially motor movement on the Y axis this weekend or next latest.
-
23-08-2016 #3
Hi Chaz
nice hear of your progress, can you give a detailed run through on the rail fixing process, am curios as to how this is done.
Regards
Mike
-
23-08-2016 #4
-
23-08-2016 #5
Putty done, levels look good. I am using a surface plate upside down as a table but also to get alignment of the ballscrew / mounts before I putty the level for the bearing holder.
-
19-09-2016 #6
I am having some issues with the epoxy I ordered and its delaying my build.
Can anyone recommend an epoxy which is suitable to do hold things like nuts in place for where the rails get mounted etc?
Thanks
-
19-09-2016 #7
Hi Chaz
This any good?