Thread: Thor, or should that be Zeus?
Hybrid View
-
20-09-2016 #1
-
20-09-2016 #2
I have 2 requirements. The first is to hold M12 nuts in place that allow me to tighten the bolts holding the rails in place.
Secondary is similar where ill either sink nuts for holding and mount hardware the same way (motor mounts etc) or where Ill epoxy thread bar in place. My preference is to sink the nuts so I can use bolts from the top.
-
20-09-2016 #3
I don't think you will have enough purchase with the nuts as they might pull out, also think about getting epoxy in the threads and the bolt will have to go right through the nut into some pocket or other. If you look at the chart on the http://www.ebay.co.uk/itm/ANCHORSET-...c=1&rmvSB=true
it shows how deep the hole should be for a 10mm rod
Re the colour I have to pass but you could phone Sika up and ask their techy guys...Clive
The more you know, The better you know, How little you know
-
20-09-2016 #4
-
20-09-2016 #5
IVe ordered one of each, will try them and see.
-
24-09-2016 #6
Main gantry poured, will post pics later.
Used a bit less plastisizer this time. 950ml per 25kg of cement. I tried with the minimim recommended amount of 500ml but not enough water so the mix was really tight.
-
19-12-2016 #7
Wow, 3 months have gone, I am piss poor at keeping this thread updated.
So gantry was done, Y motor mounted, some test movement here:-
https://www.youtube.com/watch?v=5sMb4XmzuXc
Ignore the last 100mm or so that is unsupported. Long story, That will be epoxied it later.
A pic of how it all looks, my wife not happy with me taking pics of her. Testing the fit before I attempt to epoxy this lot together.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)




Reply With Quote
Bookmarks