Made a bit more progress over the weekend,
Got one of the X axis screws mocked up
Here I am machining the spring loaded brackets that will act as X ballscrew mid supports. These will support the screw and when the gantry goes by will move out of the way on the pivot. I need to get some shoulder bolts still for these and do a bit more machining for clearance of the ballnut as it passes (to ensure that it cant get hung up on a change of direction).
I also got a air valve block installed on the gantry for all the air that the Z axis needs, also put a terminal block on the gantry in order to reduce the number of wires that needs to make its way back to the control. I ordered some 20 conductor shielded communication cable to go from the control to the gantry terminal block. Gives me a few extra wires incase I need any future expansions or additions.
Im getting excited as its closer and closer to cutting. I am waiting on new toothed pulleys for the Y and X as I made a mistake when ordering, once those are in it will be time for truing and squaring then cutting.
More to come....
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: First time build - Steel Frame CNC Router
By examorph in forum DIY Router Build LogsReplies: 144Last Post: 19-10-2023, 06:25 PM -
BUILD LOG: New Build, Aluminium Frame Router/Mill
By Davek0974 in forum DIY Router Build LogsReplies: 101Last Post: 31-08-2016, 05:28 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks