Threaded View
-
07-01-2017 #33
Made some good progress on the machine, I am to the point of wanting to run a gcode program, although there is alot to do before I can actually cut.
I loaded a sample Gcode program just to see all 3 axes move together
I moved the machine 12 inches away from X and Y and put my Z in the middle of travel and zeroed the DRO's for work start. When I hit cycle start (with my hand firmly on the e-stop...) I get a message "Move off limits before cycle start". I then checked the I/O window in CSMIO config and no limit switches are tripped. I tried a few other things within mach with no luck. I then turned off all limits (except e-stop) and I get the same message. Did some searching/reading on forums and didnt come across anything.
Anyone have any thoughts on what this could be? I hope its something simple that I just havent turned on/off?
I plan to a write up on the progress, just this issue has me frustrated so thought I would ask.
Thanks
Thread Information
Users Browsing this Thread
There are currently 30 users browsing this thread. (0 members and 30 guests)
Similar Threads
-
BUILD LOG: First time build - Steel Frame CNC Router
By examorph in forum DIY Router Build LogsReplies: 144Last Post: 19-10-2023, 06:25 PM -
BUILD LOG: New Build, Aluminium Frame Router/Mill
By Davek0974 in forum DIY Router Build LogsReplies: 101Last Post: 31-08-2016, 05:28 PM -
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks