Thanks eurikain.

Yes I have discovered that the IP-M controller requires the limits/home switches wired in parallel, I am now modifying the wiring from the series set up that I was using with the old break out board.

I have to that the service from Zapp and CS Labs has been exceptional. I had an issue with network access with the IP-M and couldn't have wished for more help in sorting it out.