davethefixer
21-03-2013, 11:13 PM
Hi all
iv been looking for the best method of connecting my timing pullys to the stepper mators and ball screws.
on my first build i used grubscrews directly onto the shafts and had problems with them slipping and recking the end of the shaft/screw
So having serched the forum i visited various websites recommended by various members until i came accross these at Beltingonline.com, Supplier of power transmission and conveying products (http://www.beltingonline.com)
TRANSLOCK® PARALLEL SHAFT LOCKING BUSHES
8535
and
Taperlock Bushes
8536
the question is has anyone had any any experiance for these ?
iv been looking for the best method of connecting my timing pullys to the stepper mators and ball screws.
on my first build i used grubscrews directly onto the shafts and had problems with them slipping and recking the end of the shaft/screw
So having serched the forum i visited various websites recommended by various members until i came accross these at Beltingonline.com, Supplier of power transmission and conveying products (http://www.beltingonline.com)
TRANSLOCK® PARALLEL SHAFT LOCKING BUSHES
8535
and
Taperlock Bushes
8536
the question is has anyone had any any experiance for these ?