. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    I had some more time today, and tried going through assembly / maintenance steps in my head, and I discovered some issues.

    Once the Z axis is mounted, it is no longer possible to adjust the rails or the sleds.
    To address this, I switched to the wider HGW20CC sleds and added access holes through the front plate so that they can easily be adjusted. I also changed how the spacer plates for the rails work, so that they can be adjusted through the front plate as well.
    I also added extra holes to the side plates to allow direct access to the grease nipples on the sleds.
    Click image for larger version. 

Name:	1.png 
Views:	1098 
Size:	139.7 KB 
ID:	29956Click image for larger version. 

Name:	2.png 
Views:	1087 
Size:	194.8 KB 
ID:	29957Click image for larger version. 

Name:	3.png 
Views:	1082 
Size:	210.6 KB 
ID:	29958

    As for the X and Y axis, I flipped the FF bearings, so that I can install / remove the ball screws without having to disassemble half of the machine...

    In terms of motors, I'm back to my initial choice, the Lichuan Nema24 LC60H2127 / LC60H2102 motors with LCDA86H drivers. For some reason the shipping cost on their aliexpress store has come back down to reasonable levels. Let's hope it stays that way until I'm ready to order...

    For timing pulleys, I want to give these clamping type pulleys a try. For testing purpouses, I think I'll just order a couple of them and mount them onto some precision rod I have laying around, to test runout and how much torque they can take before slipping.
    If they work well, I'll probably go with 25 teeth htd 5m pulleys.
    Not sure if I should use 15mm or 20mm belt width though.

    As suggested, I also modified the gantry layout from a single 160x80 profile to 120x80 + 160x40 profiles (L shape)
    Click image for larger version. 

Name:	4.png 
Views:	1104 
Size:	490.9 KB 
ID:	29959Click image for larger version. 

Name:	5.png 
Views:	1076 
Size:	402.9 KB 
ID:	29960

  2. #2
    NB70's Avatar
    Lives in Swansea, United Kingdom. Last Activity: 4 Weeks Ago Has been a member for 9-10 years. Has a total post count of 61. Received thanks 10 times, giving thanks to others 9 times.
    Click image for larger version. 

Name:	double-plate.png 
Views:	1098 
Size:	186.5 KB 
ID:	29977
    Its looking good Jeff. I've used a similar design for my gantry. I took a tip from Jazz-CNC that its easier to assemble & align it if you use 2 separate plates bolted together (see picture) - if you oversize the bolt holes it also gives you some room for adjustment / squaring. The whole gantry can lift then off and you leave the long axis ballscrew mount & linear bearings in place on the bottom plate.

  3. The Following User Says Thank You to NB70 For This Useful Post:


  4. #3
    Quote Originally Posted by NB70 View Post
    Click image for larger version. 

Name:	double-plate.png 
Views:	1098 
Size:	186.5 KB 
ID:	29977
    Its looking good Jeff. I've used a similar design for my gantry. I took a tip from Jazz-CNC that its easier to assemble & align it if you use 2 separate plates bolted together (see picture) - if you oversize the bolt holes it also gives you some room for adjustment / squaring. The whole gantry can lift then off and you leave the long axis ballscrew mount & linear bearings in place on the bottom plate.
    That is a fantastic idea. Thank you, I'm definitely going to implement this.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: 8x4 router build. Steel base & Aluminium gantry gantry
    By D-man in forum DIY Router Build Logs
    Replies: 57
    Last Post: 13-12-2019, 10:43 AM
  2. BUILD LOG: First Build-Steel Gantry CNC - Comments on design wanted
    By olaff in forum DIY Router Build Logs
    Replies: 13
    Last Post: 06-12-2015, 08:34 PM
  3. First build - Mid-scale gantry router design
    By Ellis in forum Gantry/Router Machines & Building
    Replies: 8
    Last Post: 20-05-2015, 11:43 PM
  4. BUILD LOG: Vertical fixed gantry. Design & build. (Steel/epoxy)
    By Greeny in forum DIY Router Build Logs
    Replies: 8
    Last Post: 19-08-2013, 08:26 PM
  5. Design help etc required with DIY CNC Router Design / Build
    By MikeyC38 in forum Gantry/Router Machines & Building
    Replies: 12
    Last Post: 21-10-2011, 04:50 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •