Thread: Let the fun begin !!! ???
Threaded View
-
02-06-2015 #34
I have a 2-way centre-off switch mounted on my control box which has an old pc power supply in it. That gives me both +5 and +12 selected via the switch - purely manual operation. My new machine (under construction for rather too long now) will use gcode switching via the motion control card; I'm not sure yet whether to stick to 5V or to add a manual override to give a short 12V burst at the start of a session or when first pushing water through the system. Once the pipes are full, the system is balanced and it doesn't need much to keep the water circulating (from a bucket at the side of the bench - never gets very warm but I'm not working the spindle very hard).
-
The Following User Says Thank You to Neale For This Useful Post:
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
NEW MEMBER: Hello everyone. Total newbie here. Where do I begin?
By DarkWalkJRB in forum New Member IntroductionsReplies: 2Last Post: 07-02-2012, 08:31 PM
Bookmarks