Threaded View
-
28-01-2014 #11
Now something very important. I will not move the frame at all. After a week has passed will solder the gantry and sides. Then will turn upside down the gantry and lay the upper side on the level surface of the epoxy. Then will pour epoxy on the gantry side plates that step on the Hiwin bearing blocks, connecting them together. Also pour epoxy on the lower side of the gantry beam. When dry, will turn the nagtry to normal position , rest the leveled side plates / epoxy on epoxy/ and pour the final epoxy at the top side of the gantry beam.
So with these steps i will achieve all hiwin rails lay on epoxy surfaces that are paralel to each other. The only thing left will be to ensure squareness of Z. I hope to achieve a quite precise machine.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
BUILD LOG: Steel frame cnc router design/build
By CraftyGeek in forum DIY Router Build LogsReplies: 110Last Post: 06-05-2015, 10:00 PM -
BUILD LOG: First steel diy CNC router build
By ivars211 in forum DIY Router Build LogsReplies: 59Last Post: 28-07-2014, 08:29 PM -
Need help, buy or build to cut steel, stainless steel, titanium etc
By fatguyslim in forum Machine DiscussionReplies: 41Last Post: 08-02-2014, 11:37 PM -
A Sturdy Steel Framed Machine Design
By Boyan Silyavski in forum Machine Frames & BedsReplies: 0Last Post: 06-11-2013, 05:58 PM -
BUILD LOG: 7' X 4' Steel frame build
By Ricardoco in forum DIY Router Build LogsReplies: 6Last Post: 28-10-2012, 06:02 PM
Bookmarks