Quote Originally Posted by EddyCurrent View Post
There's not a lot of progress to report, but thank you kindly for your support.

It took only a few minutes to remove the meniscus using a course file, because there was 10mm each side of the rail it meant there was no need to get it perfectly flat across the whole width. I did run a bead of liquid nails down each side of the epoxy just to give a nice transition onto the metal.
Got the rails on, one support beam painted, 20mm aluminium gantry support bracket fitted and ballnut bracket attached.
Ball screw temporarily installed just to show actual position. Tried to keep rail and ballscrew in same horizontal plane as much as possible.
I had to regrind some drills to make counter boring tools for the cap head screws.

Click image for larger version. 

Name:	gantry1.jpg 
Views:	3037 
Size:	109.1 KB 
ID:	11588Click image for larger version. 

Name:	gantry3.JPG 
Views:	2978 
Size:	92.4 KB 
ID:	11589Click image for larger version. 

Name:	gantry4.JPG 
Views:	3064 
Size:	120.7 KB 
ID:	11590Click image for larger version. 

Name:	gantry5.jpg 
Views:	3144 
Size:	110.0 KB 
ID:	11591Click image for larger version. 

Name:	gantry6.JPG 
Views:	3052 
Size:	120.1 KB 
ID:	11592

Showing end of beam with rail, epoxy, 6mm internal flat bar to give extra thickness for rail mounting screws, glued it in with Gorilla Glue and worked great.
Click image for larger version. 

Name:	gantry7.jpg 
Views:	3182 
Size:	129.7 KB 
ID:	11593
Eddy how did you ensure your x rails were parallel and x and y were 90 degrees to each other??