Hybrid View
-
Yes in this case the common goes to the meter (yellow wire) but the red wire will have to be energised from the battery because the solar panel may not be providing enough Voltage to drive the meter. The -ve on the solar panel will have to be connected to the battery -ve hope this helps you could of course put 2 meters on the system ..Clive
Last edited by Clive S; 01-08-2014 at 07:31 PM.
-
01-08-2014 #2
-
I used 4 on my control box all different colours vey pretty
..Clive
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Mach 3 control panel help
By IanParkin in forum Artsoft Mach (3 & 4)Replies: 19Last Post: 05-09-2014, 04:05 PM -
Control Panel Guidance
By GTJim in forum General ElectronicsReplies: 2Last Post: 03-09-2013, 08:42 PM -
solar tracking
By luke11cnc in forum Electronic Project BuildingReplies: 2Last Post: 27-04-2013, 09:47 AM -
Small panel for my CNC
By jcb121 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 19-02-2012, 12:21 PM -
Panel Mount Voltage Regulator / Knob
By Lee Roberts in forum General ElectronicsReplies: 21Last Post: 29-11-2008, 01:23 AM
Bookmarks