Would this type of arrangement work, placed at the ends of the bridges where they meet the rail channels ?
http://ocw.mit.edu/ans7870/2/2.25/as...5-3/index.html
I'm thinking that when the epoxy is thin it will find the same height each side but as it hardens it will be more difficult for it to flow back into the bridge.