. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Quote Originally Posted by JAZZCNC View Post
    Edit: Better elaborate on the Epoxy comment.!! . . . You must put piece of cling film or thin plastic between top rail and putty other wise you'll stick the buggers together and never get them off. . . . . .Oh and it's not expensive. 125g packs for £2 and it goes fair way has your only spreading thin, 2-3 tubes will do full machine.
    Try sellotape or brown packing take next time. It self releases.

  2. #2
    Quote Originally Posted by r0bsk1 View Post
    Try sellotape or brown packing take next time. It self releases.
    Yep good idea, I just normally use plastic sheet because I generate shit loads of it at work and it's free. . . . .. Well not free suppose because I've paid for it when bought the bloody stuff it was covering. .

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. BUILD LOG: First steel diy CNC router build
    By ivars211 in forum DIY Router Build Logs
    Replies: 59
    Last Post: 28-07-2014, 08:29 PM
  2. BUILD LOG: Steel/Aluminium design/build, sorta smallish, cuts ali hopefully
    By mart154 in forum DIY Router Build Logs
    Replies: 27
    Last Post: 19-09-2013, 05:48 PM
  3. BUILD LOG: Vertical fixed gantry. Design & build. (Steel/epoxy)
    By Greeny in forum DIY Router Build Logs
    Replies: 8
    Last Post: 19-08-2013, 08:26 PM
  4. BUILD LOG: 7' X 4' Steel frame build
    By Ricardoco in forum DIY Router Build Logs
    Replies: 6
    Last Post: 28-10-2012, 06:02 PM
  5. Design help etc required with DIY CNC Router Design / Build
    By MikeyC38 in forum Gantry/Router Machines & Building
    Replies: 12
    Last Post: 21-10-2011, 04:50 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •