. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11
    Quote Originally Posted by Neale View Post
    Depends on whether you have a gantry to use as a gauge? I had built the structure of my gantry in advance for this purpose, so I bolted down one rail along the box section centre line, placed the second rail on its box section, and attached the carriages to use to align the rails. I think, in essence, you are doing the same thing but you will then pick off the rail spacing dimension to finalise the gantry. Hiwin recommend aligning the rail against a machined step but where this is not possible you align the second rail from the first. My only reservation is how you guarantee the straightness of the first rail but I think you can finally adjust this by test cutting. I hope so, anyway!
    Quote Originally Posted by EddyCurrent View Post
    Looks a nice epoxy job.
    To fit the first rail I clamped a good wide straight edge on top of the beam then butted the Hiwin rail up to it, like Neale said about the machined step. Then I mounted the gantry and used the bearings themselves to line the second rail, just nipping the bolts up slightly. Before fully tightening the second rail down I put the straight edge up to it to make sure there were no kinks. After that I also checked the distrance between them at points along the length just too make sure they were parallel.
    Thanks guys.....

    I'm going to do a similar thing to both of you. I don't have a good straight edge that I can butt the rail up to so I'm going to use the first rail as a reference and use the dummy gantry to get the second rail square to the first. Regarding striaghtness of the rails I might look at using a small laser pointer that I have to shine along the length to check for any bend in the rail, not sure if this will work but don't see why not in principle?

    Got some more cutting discs (and G clamps to clamp the rails) on the way in to work this morning so I can cut the second rail to length. Looks like it's going to be lots of drilling and tapping today, hope there's not too much proper work to get in the way of doing this...!
    Last edited by njhussey; 07-01-2015 at 10:49 AM.
    Neil...

    Build log...here

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Similar Threads

  1. Does anyone want to build me a cnc router?
    By totally useless in forum Open Source Designs & Plans
    Replies: 25
    Last Post: 05-05-2014, 12:44 AM
  2. My new, and first build....comments greatfully received
    By berk in forum Gantry/Router Machines & Building
    Replies: 7
    Last Post: 12-01-2014, 03:15 PM
  3. BUILD LOG: CNC Router New Build
    By PilotTom in forum DIY Router Build Logs
    Replies: 12
    Last Post: 25-05-2013, 03:49 PM
  4. BUILD LOG: A3 Router Build
    By GTJim in forum DIY Router Build Logs
    Replies: 6
    Last Post: 17-02-2012, 12:53 PM
  5. CNC construction TUNISIA give your comments
    By ali hedi in forum Gantry/Router Machines & Building
    Replies: 5
    Last Post: 06-07-2011, 11:58 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •