Quote Originally Posted by biketrialsdave View Post

I am now looking at the Y axis ballscrew mounts in a little more detail. In the screenshot below how is the bearing mount attached to the steel box section? (Does anyone have a link to this build thread btw?)

Click image for larger version. 

Name:	How.jpg 
Views:	753 
Size:	97.8 KB 
ID:	12854

I assume that there's another piece of welded steel plate on the end of the box section? As below?

Click image for larger version. 

Name:	End plate.JPG 
Views:	667 
Size:	29.1 KB 
ID:	12855

While I am on the subject of the "end plate", I assume some sort of adjustment will need to be built in to allow movement in the Z axis as if I use the epoxy method on the box section then it's going to add some height?

Dave
Is anyone able to answer any of the above? It would be great if there was a link for the red router listed?

Cheers,

Dave