. .

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Barry, im going to have the cables from the steppers coming in to the control cabinet and earth them to the star point and the cables from the drivers are also earthed at the star point. They connect via the din terminals. I'm also contemplating having a junction box on the machine and wiring to that and then the motors etc....
    Neil...

    Build log...here

  2. #2
    Quote Originally Posted by njhussey View Post
    Barry, im going to have the cables from the steppers coming in to the control cabinet and earth them to the star point and the cables from the drivers are also earthed at the star point. They connect via the din terminals. I'm also contemplating having a junction box on the machine and wiring to that and then the motors etc....
    I think you are fine with the earthing effectively earthed part way down the cable as long as you don't make a loop ie earth both ends. I don't think it is a good idea with the junction box on the router in my humble opinion what is the point in chopping a perfectly good cable and then putting a join in it. ..Clive

  3. #3
    Quote Originally Posted by Clive S View Post
    what is the point in chopping a perfectly good cable and then putting a join in it. ..Clive
    Well to start with the router will be floor mounted until I make the frame for it to live in vertically (at the rate I'm going that'll be months...)....so I was thinking to save having cables longer than I need dangling everywhere until it's finally sited I'd have a JB and when it's in its final position adjust the cables to suit....
    Neil...

    Build log...here

  4. #4
    Quote Originally Posted by njhussey View Post
    Well to start with the router will be floor mounted until I make the frame for it to live in vertically (at the rate I'm going that'll be months...)....so I was thinking to save having cables longer than I need dangling everywhere until it's finally sited I'd have a JB and when it's in its final position adjust the cables to suit....
    Ah I now remember you are going to mount it vertical. But you will still have to have the continuity of the screens in the JB. ..Clive

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Does anyone want to build me a cnc router?
    By totally useless in forum Open Source Designs & Plans
    Replies: 25
    Last Post: 05-05-2014, 12:44 AM
  2. My new, and first build....comments greatfully received
    By berk in forum Gantry/Router Machines & Building
    Replies: 7
    Last Post: 12-01-2014, 03:15 PM
  3. BUILD LOG: CNC Router New Build
    By PilotTom in forum DIY Router Build Logs
    Replies: 12
    Last Post: 25-05-2013, 03:49 PM
  4. BUILD LOG: A3 Router Build
    By GTJim in forum DIY Router Build Logs
    Replies: 6
    Last Post: 17-02-2012, 12:53 PM
  5. CNC construction TUNISIA give your comments
    By ali hedi in forum Gantry/Router Machines & Building
    Replies: 5
    Last Post: 06-07-2011, 11:58 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •