The spoil board is 28mm MDF cut in half and put on top off itself so the picture show it at 4ft x 4ft. The holes were plugged with 6mm threaded inserts which will be used to hold down the material to be cut. The whole lot will be fixed to the orange metal as seen in photo so as to be able to be leveled up as needed.
Once i get the Hypertherm up and running, the board will be removed to expose the water table (yet to be built). The material for the water table is underneath the MDF ready for welding.

There is still a few teething problems which i will update or change as they rear their heads. But i will be putting a few photos on to get some feed back for the connection of the Hypertherm to my THC and also to wire the VFD up to be remote controlled from Mach 3.
Hopefully gets some help from the forum....
Many thanks
Tommy