. .

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11
    I would not bother with pre-charge, this supply is not big enough to need it, as long as the rectifier is big enough to take the inrush as well as a slow-blow fuse in the input it should work fine.

    Pre-charge is easy with a resistor in the output before the rectifier, maybe 10r 25W and a timer relay which shorts out the resistor after maybe 2s would do it but i wouldn't bother myself. Pre-charge is more used with supplies that have very large capacitors/higher voltages.

  2. The Following User Says Thank You to Davek0974 For This Useful Post:


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. New Table Build, 12x6 work area, drawings up any advice?
    By silverdrgn in forum Plasma Table Machines
    Replies: 3
    Last Post: 23-01-2016, 07:34 PM
  2. BUILD LOG: My 1st Hybrid Steel/Ally (1150 x 850 work area) (comments/advice please)
    By lebies in forum DIY Router Build Logs
    Replies: 18
    Last Post: 19-08-2014, 12:00 PM
  3. BUILD LOG: Melbourne Andy CNC build 1220x810 work area
    By AndyGuid in forum DIY Router Build Logs
    Replies: 4
    Last Post: 20-04-2014, 08:25 PM
  4. RFQ: acetal parts turned lathe work
    By dazza in forum Projects, Jobs & Requests
    Replies: 10
    Last Post: 13-06-2013, 10:15 AM
  5. Wanted - Regular work for reliable machine shop in Northants/Kettering area
    By Narkedat90 in forum Opportunities Available & Sought
    Replies: 4
    Last Post: 06-04-2013, 04:09 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •