Thread: 1st Build, Second machine
Threaded View
-
30-08-2011 #11
This, in my opinion, suggests that:
Either way obviously I agree that rails on the 'front' is strongest. It's one of a number of things virtually everyone does wrong to start with, myself included. It also reduces the length of material required for the Z-axis. The only disadvantage I can think of is that you're also having to move the stepper motor and screw against gravity ... but that's almost certainly negligible.
Ideally you should also machine a slot in the plate for the rails so that one of them can be clamped in place. The same is true for the bearing blocks. If the machine crashes it helps stop them move out of alignment. I don't know if you have a milling machine though?
Perhaps there wasn't much point. I thought I was reinforcing/clarifying it.Last edited by Jonathan; 30-08-2011 at 07:22 PM.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
CNC Build - TEP milling machine conversion
By craynerd in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 06-07-2015, 02:09 AM -
Someone to help me build a machine
By mandev in forum Gantry/Router Machines & BuildingReplies: 8Last Post: 29-01-2014, 02:07 PM -
DIY Machine to Build?
By paulkane1 in forum Gantry/Router Machines & BuildingReplies: 3Last Post: 03-12-2012, 02:24 PM -
NEW MEMBER: Second machine build
By tmsboss in forum New Member IntroductionsReplies: 1Last Post: 04-09-2010, 01:11 PM -
Best Type of Machine to Build?
By Kevin in forum Gantry/Router Machines & BuildingReplies: 6Last Post: 05-08-2009, 02:50 PM
Bookmarks