Thread: New build help needed
Hybrid View
-
16-12-2015 #1
VAGELIS IS BACK!!!!
Dean and Argiris thank you for your good words.
Argiris is the one who make me restart my project sooner as I expected
I explained him about the community of mycncuk.com and how the people here help help help, and the most important selflessly
Personally i feel thankfull ...
Dean the ladies often tell these words to the "small tool" owners in order to console them.
And a little story about "tools" that shows the superiority of the Greeks (here we laugh!!!) who think that we are the center of the world.... (here we laugh again)
An African and a Greek stand on a bridge and pee. Underneath runs a river. They stand on the bridje back to back ( the one cant see but only listen the other).
The African in order to vex the Greek says
"I feel the river is Cold today"
and Greek replies
"And deep"
Argiris good luck give us some plans.The creative adult, is the child who survived
-
16-12-2015 #2
-
16-12-2015 #3
Oh dear, I am not the only Greek on here any more. Vaggo, looking forward to seeing your cutting machine too.
https://emvioeng.com
Machine tools and 3D printing supplies. Expanding constantly.
-
21-12-2015 #4
Kingcreaky thank you for the files.
Looks really nice. Is it 3100mm in the long axis? Are you bolting the plates to the vertical frame first and then weld the cross members in place or have them made before with the 2 plates attached and then bolt them to the vertical frames? Can I pre-drill plates and side members using a jig in a bench drill then tap then start building the frames or I will be way too off?
Being new to CAD I spend the last 3 days trying o design a preliminary plan of the base. My main concern was to be able to design it parametrically so I can change most of it on the fly without having to redesign it again. So far it works well even though the design structure is like spaghetti code.
The base steel tubing is 60x 60 x 5 and the lower grid is 60 x 40 x 3.
The top right and left tubing would be bolted to the base for adjustment purposes if that is an extra benefit.Then epoxy leveling .
Any suggestions where to source the Hiwin rails? CAD files for them?
Thank you allLast edited by arg123; 21-12-2015 at 10:51 AM.
-
21-12-2015 #5
Any particular reason your using so many cross members? Just out of interest how far are they separated? Its certainly not a bad thing, the more the merrier I would think, however I think it would be significantly stronger in terms of deflection to have fewer cross members that where triangulated to the bottom rails rather than more with no triangulation. Having more would be beneficial though because it would support the sheet more evenly along its length.
-
21-12-2015 #6
They are 311mm apart when the base is 2800 x 1650.I was thinking of having the lower grid of the base free for storing ply .
-
21-12-2015 #7
Argyri,
Looking good!
The best place to get the Hiwin CAD models is http://www.hiwin.de/en/CAD_Configurator.html
Most cost effective way to get the rails and carriages is to go east. I would suggest that you get carriages with preload so they do not have any slop, it adds a bit to the friction but worth the extra effort.
In order to account for distortion etc I would suggest you build, level and then drill. A hand drill with good bits and a drilling jig like you describe is good as long as you make provision to straighten the rails afterwards. Have a look at installation instructions from HIWIN which is similar to this NSK one for ideas on mechanisms to align and adjust for straightness and squareness, if you haven't already done so.
You could have the top sections on bolts but what would be the benefit if you epoxy level and drill afterwards? From our conversation it seemed that you were not thinking of moving the machine around so stripping it down is not needed. I would have thought that, should you crash the machine, you would need to readjust everything including the rails. In a rigid system, you will potentially only need to readjust the rails.
Regards
Georgehttps://emvioeng.com
Machine tools and 3D printing supplies. Expanding constantly.
-
21-12-2015 #8
Yeah that seems reasonable.
-
21-12-2015 #9
I see a few things I would change but rather than put into words it's easier to show you. Most Should be obvious but ask if not sure.
The reason for top rail being longer at each is to recover some wasted bed space plus makes machine shorter. Also allows gantry to ride past the end so can use end of machine for standing boards upright or fitting 4th axis across end if required. Long overhang would be rear short would be front.
Last edited by JAZZCNC; 21-12-2015 at 06:26 PM.
Thread Information
Users Browsing this Thread
There are currently 1 users browsing this thread. (0 members and 1 guests)
Similar Threads
-
Build log. Design advice needed.
By eurikain in forum Gantry/Router Machines & BuildingReplies: 0Last Post: 25-06-2015, 06:53 PM -
What's needed for a 3d printer build??
By Davek0974 in forum 3D Printing MachinesReplies: 26Last Post: 18-02-2014, 11:54 AM -
BUILD LOG: my router build - advice needed
By thomashomer1986 in forum DIY Router Build LogsReplies: 10Last Post: 02-12-2013, 11:45 PM -
RFQ: Help needed to build my first machine NE Norfolk
By Dorg in forum Projects, Jobs & RequestsReplies: 3Last Post: 31-10-2012, 09:30 AM -
WANTED: Needed for my build
By jpcnc in forum Items WantedReplies: 9Last Post: 08-01-2011, 02:22 PM
Bookmarks